GroupWise Disaster Recovery Profile Schedule Files

  • 7019901
  • 20-Oct-2009
  • 18-Apr-2019

Environment

GroupWise Disaster Recovery (Powered by Reload)

Situation

The schedule files for GroupWise Disaster Recovery (GWDR) contain the schedules for all of the jobs that are running in GWDR. They can sometimes end up becoming corrupt, usually due to lack of disk space and removing them, or adjusting them manually can be done here. 

Resolution

The configuration files for the profile schedules are located under /opt/beginfinite/reload/conf/cron.

The files start with the name of the profile followed by a description of what the schedule is for. Depending on what types of jobs you have configured for the profile will determine which schedule files have been set up for it. Generally, you will have schedules for standard, portable, expire and tape jobs.

Examples of the names are listed below, for a profile titled ‘test’.
Expire job schedule: test.expire.standard.schedule.conf
Portable job schedule: test.full.standard.schedule.conf
Standard job schedule: test.inc.standard.schedule.conf
Tape job schedule: test.tar.standard.schedule.conf

Additional Information

This article was originally published in the GWAVA knowledgebase as article ID 1502.